Ace and Turf

Contact us

1870 N Corporate Lakes Blvd #268177 Weston, FL 33326

Email us

allcountyexcavationinc@gmail.com

Call for Pricing

954-955-6512

South Florida’s rainy season runs roughly from late May through October, and it changes how site work gets done. Afternoon storms, high water tables and saturated soil all slow earthwork down. Planning around them saves days and money.

Wet soil doesn’t compact

Soil has to be near the right moisture content to compact properly. After heavy rain, fill can be too wet to reach density, and pushing ahead anyway leads to failed tests or soft spots that show up later as cracks or settling. Sometimes the right call is to wait a day, or to spread and dry material before compacting.

The water table rises

In much of South Florida, groundwater sits close to the surface, and it climbs during the wet months. Deeper excavations, utility trenches and lake digging can fill with water quickly. That means more dewatering and more careful sequencing of when trenches are opened and closed.

Access gets harder

Unpaved sites turn soft, and loaded trucks can rut haul roads or get stuck. A stabilized construction entrance and shellrock haul roads keep material moving and keep mud off public streets.

Erosion and runoff

Freshly graded ground washes easily. Silt fence, inlet protection and getting sod down on finished areas quickly help keep soil on the site and out of storm drains — and keep the site in line with its permit requirements.

How to plan for it

  • Schedule mass grading and pad work in the drier months when possible.
  • Build weather days into the schedule for summer and early fall work.
  • Get haul roads and drainage working early so the site recovers quickly after storms.
  • Close trenches and finish areas promptly instead of leaving open ground.

Starting site development and want a realistic schedule? Call (954) 955-6512 or send your plans for pricing.